What are my off-mains drainage options?

1. Packaged sewage treatment plant

A packaged sewage treatment system is recommended where possible, as these provide secondary biological treatment to produce a high quality effluent suitable for discharge directly to a watercourse, or drainage field if a suitable watercourse is not available.

All Klargester and Conder systems are BSEN12566/3 certified, are suitable for most applications and are readily accepted by Building Control and the Environment Agency.

Information on siting your sewage treatment system is available in Building Regulation Approved Document H, and we have also provided articles onsizing the appropriate system for your needs, and thedifferent sewage treatment systems we supply.

2. Septic tank

A septic tank provides minimal treatment of effluent - the septic tank settles out the solids, and the settled effluent relies upon further treatment in a well-constructeddrainage field. Septic tanks should not discharge directly or indirectly to watercourses - the effluent needs to be further treated through aerated layers of soil and percolated into surrounding soil.

Septic tanks can only be installed if ground conditions are suitable, which means conducting asoil porosity (percolation) test.

When siting a septic tank, there are clear regulations to follow regarding proximity to buildings which are outlined inBuilding Regulations Approved Document H

3. Cesspool

A cesspool is simply a storage tank with an inlet and no outlet – when the tank is full, the raw sewage must be tankered off site to a sewage treatment works. In Scotland, Building Regulations do not permit the use of cesspools. In the UK, depending on the size of the cesspool, Building Regulations request a minimum of 18000l for two people + 6800l for each additional person. Due to there being no treatment of effluent and consequently no outlet drainage, the cesspool may require frequent emptying which can be prohibitively expensive.

Useful Documents

Building Regulations Approved Document H

Environment Agency Pollution Prevention Guidelines 4 - treatment and disposal of sewage where no foul sewer is available

  • Tuesday, 29 September 2015

Read Our Wastewater Blog

  • Blasted Baffles to BioTec Brilliance

    Blasted Baffles to BioTec Brilliance

    Wednesday, 26 September 2018
    In the fresh spring months of 2018 the R A Dalton contracts managers were as busy as ever carrying out site visits for numerous different scenarios; amongst these there was a property that was...
  • Don't just flush it!

    Don't just flush it!

    Friday, 14 September 2018
    Ah, the summer holidays... We all seem to spend 9 months of the year looking forward to them, 2 months enjoying and 1 month being glad they’re gone; looking forward to sunbathing in the lush...

Feedback From Satisfied Customers

  • We were very please with the work. Project management was excellent. Even though it was a dry week in a dry spell disruption to the ground was minimal given the machinery involved and the site was left neat and tidy.
    Anonymous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26

North Location


RA Dalton
Burtreeford
Bishop Auckland
County Durham
DL13 1DB
01388 537030
info@radalton.co.uk

South Location


RA Dalton
Unit 22, Midway Business Centre
Bridge Street Industrial Estate
Clay Cross
Chesterfield
S45 9NU
01246 865412
chesterfield@radalton.co.uk 

Scotland Location


21 Carron Place
Kelvin Industrial Estate
East Kilbride
G75 0YL
01698 827628
glasgow@radalton.co.uk